Module: Advanced APS v1.0.0
What is Advanced APS?
Advanced Planning & Scheduling for Perfex CRM — work centers, MRP, Gantt, capacity planning & analytics
This module installs into modules/advanced_aps/ and adds its own admin menus, permissions, and database tables — without editing Perfex CRM core files.
Who should use this module?
- Admins — activate the module, configure Settings, assign roles, and manage integrations.
- Operators / day-to-day staff — create and update records (orders, attendance, shipments, messages, etc.).
- Managers / approvers — review queues, approve workflows, and monitor dashboards/KPIs.
- Finance / compliance / ops leads — run reports, exports, and audit trails when the module supports them.
What you can achieve
- Keep all related work in one place inside Perfex CRM instead of spreadsheets.
- Control who can view, create, edit, approve, or export with role permissions.
- Use dashboards and reports to see status, bottlenecks, and history.
- Connect to other CRM data (customers, invoices, items, staff) where the module integrates.
Recommended learning path
- Read How to Install and activate the module.
- Skim Features so you know what screens exist.
- Complete the Quick Start checklist on this page (Settings → masters → first sample record).
- Open each screen guide under Screen-by-screen guides when you need step-by-step help.
- Check Version & Changelog after upgrades for new options.
Tip: Train one admin first, then create a limited role for operators so they only see the screens they need.
5-minute Quick Start
Follow this short path the first time you use Advanced APS:
- Activate — Setup → Modules → activate Advanced APS (run Upgrade if prompted).
- Permissions — Setup → Staff → Roles → enable view/create/edit (and approve/settings if needed) for this module.
- Settings — Open Advanced APS → Settings and save company defaults, prefixes, and integrations.
- Master data — Create the first required masters (products, warehouses, templates, channels, accounts, routes, etc.).
- First transaction — Create one sample record end-to-end (save → submit/approve → complete) and confirm it appears in lists/reports.
- Cron — If the module uses alerts, sync, queues, or AI, confirm Perfex CRM cron is scheduled on the server.
Module documentation index
Start here — full guides for Advanced APS:
- Overview & How to Use — what it is, who uses it, daily workflow
- Quick Start Guide — first 5 minutes + printable how-to
- How to Install — upload, activate, permissions, verify
- Features (Full Detail) — every capability explained
- FAQ & Tips — common questions and best practices
- Version & Changelog — version history
Screen-by-screen guides (each tab explained)
Click a menu item below for step-by-step instructions on that Advanced APS screen:
- APS Dashboard
- Work Centers
- Shifts
- Production Calendars
- Scheduling Rules
- Demand Forecasts
- Master Production Schedule
- MRP Runs
- Planned Orders
- Gantt Schedule
- Auto-Schedule
- Capacity Load
- What-If Scenarios
- Bottleneck Analysis
- Integration
- API Keys
- Analytics & KPIs
- APS Settings
How to use in Perfex CRM (daily operations)
- Sign in to the admin area with a role that includes Advanced APS permissions.
- Open Advanced Aps (sidebar) or search for Advanced APS in the admin menu.
- Start on the Dashboard (if available) to see open tasks, pending approvals, and KPIs.
- Review Settings after upgrades — new options may need defaults for your company.
- Create or import master data first; most modules block transactions until masters exist.
- Run the main business flow (create → submit → approve → post/complete) using the screens listed in Admin menu below.
- Use Reports / Analytics screens to reconcile stock, finance, compliance, or SLA metrics.
- For integrations (API, EDI, gateways, tax), confirm credentials in Settings and monitor logs or webhook delivery screens.
- Train staff with role-based access — give approvers approve permissions only, operators create/edit on their area.
- If something fails overnight, check Perfex CRM cron ran and open the module log / failed queue screen if present.
Admin menu — where to work
Open the Advanced APS section in the admin sidebar. Screens your staff may use (depending on role):
- Analytics & KPIs
- API Keys
- APS
- APS Dashboard
- APS Settings
- Auto-Schedule
- Bottleneck Analysis
- Capacity Load
- Demand Forecasts
- Gantt Schedule
- Integration
- Master Production Schedule
- MRP Runs
- Planned Orders
- Production Calendars
- Reports
- REST API
- Scheduling Rules
- Shifts
- What-If Scenarios
- Work Centers
Screens map — what each menu is for
These are the admin screens registered by Advanced APS. Click a name in the Knowledge Base for a full how-to, or open the path in admin.
| # | Screen | Admin path | Guide |
|---|---|---|---|
| 1 | APS Dashboard | admin/advanced_aps | How to use |
| 2 | Work Centers | admin/advanced_aps/advanced_aps_work_centers | How to use |
| 3 | Shifts | admin/advanced_aps/advanced_aps_shifts | How to use |
| 4 | Production Calendars | admin/advanced_aps/advanced_aps_calendars | How to use |
| 5 | Scheduling Rules | admin/advanced_aps/advanced_aps_scheduling_rules | How to use |
| 6 | Demand Forecasts | admin/advanced_aps/advanced_aps_forecasts | How to use |
| 7 | Master Production Schedule | admin/advanced_aps/advanced_aps_mps | How to use |
| 8 | MRP Runs | admin/advanced_aps/advanced_aps_mrp | How to use |
| 9 | Planned Orders | admin/advanced_aps/advanced_aps_planned_orders | How to use |
| 10 | Gantt Schedule | admin/advanced_aps/advanced_aps_gantt | How to use |
| 11 | Auto-Schedule | admin/advanced_aps/advanced_aps_scheduling | How to use |
| 12 | Capacity Load | admin/advanced_aps/advanced_aps_capacity | How to use |
| 13 | What-If Scenarios | admin/advanced_aps/advanced_aps_scenarios | How to use |
| 14 | Bottleneck Analysis | admin/advanced_aps/advanced_aps_bottleneck | How to use |
| 15 | Integration | admin/advanced_aps/advanced_aps_integration | How to use |
| 16 | API Keys | admin/advanced_aps/advanced_aps_api_keys | How to use |
| 17 | Analytics & KPIs | admin/advanced_aps/advanced_aps_analytics | How to use |
| 18 | APS Settings | admin/advanced_aps/advanced_aps_settings | How to use |
Detailed guide — features, workflows, API & FAQ
Phase 6 features (current)
- KPI Dashboard — schedule adherence, utilization, OTD rate, avg lead time
- On-Time Delivery — planned vs actual WO completion with variance days
- Resource Utilization — daily trend charts and work center breakdown
- Schedule Adherence — scheduled vs actual operation completion detail
- Report Exports — CSV and PDF for KPI, OTD, utilization reports
- KPI Snapshots — save daily KPI aggregates for historical tracking
- Permissions:
aps_analytics,aps_reports
Phase 5 features
- Integration Hub — module connectivity status, reservation stats, event logs
- Manufacturing WO Sync — auto-schedule on WO approval; manual sync by WO ID
- Material Reservations — BOM-based availability check and inventory reserve/release
- Multi-Plant Load Balancing — cross-plant capacity summary and rebalancing suggestions
- REST API — schedule, capacity, reservations endpoints for MES/ERP
- API Keys — scoped authentication with rate limiting
- Hooks:
aps_work_order_synced,aps_material_reserved,manufacturing_work_order_cancelled
Phase 4 features
- What-If Scenarios — compare baseline, alternative, setup-optimized, and OEE-adjusted schedules
- Bottleneck Analysis — identify constraint work centers from capacity load
- Setup Optimization — group jobs by item to reduce changeover time
- OEE Integration — realistic capacity using Asset Performance Management data
- Simulation runs isolated from production (
SIM-*run numbers) - Hooks:
aps_after_scenario_run,aps_after_bottleneck_analysis
Phase 3 features
- Gantt Schedule — work center timeline with conflict highlighting
- Auto-Schedule — forward/backward finite-capacity engine
- Capacity Load — daily utilization & overload report
- Manual Reschedule — adjust operation times with conflict detection
- Manufacturing Sync — push dates to WO operations
- Hooks:
aps_after_schedule_run, optional WO-approved auto-schedule
Phase 2 features
- Demand Forecasts — item/period demand lines
- Master Production Schedule (MPS) — planned & firm quantities, forecast import
- MRP Run — BOM explosion, inventory netting, planned order generation
- Planned Orders — release production orders to Manufacturing work orders
- Hooks:
aps_after_mrp_run,aps_planned_order_released
Phase 1 features
- APS Dashboard — work center counts, type/plant charts, roadmap view
- Work Centers — capacity, efficiency, setup time, manufacturing workstation link
- Shifts — working hours, breaks, days of week (Morning/Evening/Night defaults)
- Production Calendars — plant/work center/shift with holiday & maintenance exceptions
- Scheduling Rules — priority-based engine (priority, sequencing, capacity, material, setup)
- Settings — scheduling mode, planning horizon, priority method
- Dashboard widget on main Perfex CRM admin dashboard
- Audit logging for all master data changes
---
Requirements
| Requirement | Notes |
|---|---|
| ------------- | ------- |
| Perfex CRM | 2.3.x or later |
| PHP | 7.4+ (8.x supported) |
| MySQL / MariaDB | InnoDB |
| Manufacturing | Recommended — provides work orders & workstations |
| Multi-Plant Management | Optional — plant-scoped scheduling |
---
Quick start (Phase 6)
- Pehle Auto-Schedule run karein taake capacity load data available ho
- Analytics & KPIs dashboard se schedule adherence aur utilization dekhein
- On-Time Delivery tab se completed WO ka planned vs actual compare karein
- Resource Utilization se work center load trends analyze karein
- Export CSV/PDF se reports download karein; Save Snapshot se KPI history store karein
Quick start (Phase 5)
- Settings → Integration section mein REST API aur material reservations enable karein
- Integration hub se connected modules verify karein
- Manufacturing WO approve par auto-schedule enable karein (
aps_schedule_on_wo_approved) - API Keys create karein aur external system se schedule read/write karein
- Multi-Plant active ho to Cross-Plant Load aur rebalancing suggestions dekhein
Quick start (Phase 4)
- Auto-Schedule run karein taake baseline schedule data available ho
- What-If Scenarios → Run What-If se variants compare karein
- Recommended variant dekhein (conflicts, load, setup time ke basis par)
- Bottleneck Analysis se constraint work centers identify karein
- Settings mein OEE capacity aur bottleneck threshold configure karein
Quick start (Phase 3)
- Work Centers configure karein aur Calendars/Shifts assign karein
- Planned Orders firm karein ya Manufacturing Work Orders approve karein
- Auto-Schedule → Run Auto-Schedule execute karein
- Gantt Schedule se timeline dekhein
- Capacity Load se overload check karein
- Conflicts ko Reschedule form se adjust karein
Quick start (Phase 2)
- Demand Forecasts — item demand by period define karein
- MPS create karein — forecast import ya manual lines add karein, status Firm karein
- MRP Runs → Run MRP — MPS select karke MRP execute karein
- Planned Orders review karein — production orders ko Release to Work Order karein
- Manufacturing module mein work order automatically create hoga
Quick start (Phase 1)
- Manufacturing mein workstations configure karein (optional link)
- Advanced APS → Work Centers se production resources define karein
- Shifts review karein (3 defaults pre-seeded: Morning, Evening, Night)
- Production Calendars set karein — plant/work center ke liye working time + exceptions
- Scheduling Rules configure karein — priority, sequencing, capacity rules
- Dashboard se overview dekhein
---
Permissions
| Feature key | Capabilities | Menu |
|---|---|---|
| ------------- | -------------- | ------ |
aps_dashboard | view | Dashboard |
aps_work_centers | view, create, edit, delete | Work Centers |
aps_shifts | view, create, edit, delete | Shifts |
aps_calendars | view, create, edit, delete | Production Calendars |
aps_scheduling_rules | view, create, edit, delete | Scheduling Rules |
aps_forecast | view, create, edit, delete | Demand Forecasts |
aps_mps | view, create, edit, delete | Master Production Schedule |
aps_mrp | view, create, run | MRP Runs & Planned Orders |
aps_settings | view, edit | Settings |
---
Settings
| Option | Default | Description |
|---|---|---|
| -------- | --------- | ------------- |
aps_require_manufacturing_module | 1 | Show warning if Manufacturing inactive |
aps_default_scheduling_mode | finite | finite or infinite capacity |
aps_default_horizon_days | 30 | Planning horizon in days |
aps_default_priority_method | due_date | due_date, fifo, priority, shortest |
aps_enable_auto_reschedule | 0 | Auto-reschedule on data changes (Phase 3) |
aps_show_gantt_on_dashboard | 1 | Gantt preview (Phase 3) |
---
Integration
| Module | APS usage |
|---|---|
| -------- | ----------- |
| Manufacturing | Workstation link, WO scheduling (Phase 3+) |
| Multi-Plant Management | Plant-scoped work centers & calendars |
| Inventory Management | Material availability (Phase 2+) |
No core file changes — integration is via shared tables, hooks, and helper functions.
---
Roadmap
See [docs/ROADMAP.md](docs/ROADMAP.md) for the full 6-phase plan:
---
Initial CodeCanyon release v1.0.0 includes the full feature set (work centers through analytics). Future updates will use migrations 101+.
---
2. How to Use (Quick Start)
Step A — Master data
- Work Centers — create machines/lines with capacity, efficiency, setup time.
- Shifts — define working hours (Morning/Evening/Night defaults are seeded).
- Calendars — attach holidays / maintenance exceptions to plants or work centers.
- Scheduling Rules — set priority, sequencing, capacity, material, and setup rules.
Step B — Demand & MRP
- Create a Forecast with item/period demand lines.
- Build an MPS (Master Production Schedule) from forecast or manual firm quantities.
- Run MRP to explode BOMs, net inventory, and generate planned orders.
- Review Planned Orders and release to Manufacturing work orders when ready.
Step C — Scheduling
- Open Auto-Schedule and run a finite-capacity schedule (forward/backward).
- Review the Gantt timeline; resolve conflicts with manual reschedule if needed.
- Check Capacity Load for overload days and under-utilized centers.
Step D — What-if & analytics
- Create What-If Scenarios (baseline vs alternative / setup-optimized).
- Run Bottleneck Analysis to find constraint work centers.
- Use Analytics for OTD, utilization, schedule adherence; export CSV/PDF; save KPI snapshots.
Step E — Integration (optional)
- Enable Manufacturing sync in Integration / Settings (auto-schedule on WO approval).
- Create API Keys if MES/ERP needs REST access to schedule/capacity/reservations.
3. Features
Planning master data
- APS Dashboard + admin dashboard widget
- Work Centers, Shifts, Production Calendars, Scheduling Rules
- Audit log for master-data changes
Demand & MRP
- Demand Forecasts, MPS, MRP runs, Planned Orders
- BOM explosion, inventory netting, release to Manufacturing
Scheduling & capacity
- Gantt schedule with conflict highlighting
- Auto-schedule (finite capacity), capacity load reports
- What-if scenarios, bottleneck analysis, setup optimization
Integration & analytics
- Manufacturing WO sync, material reservations, multi-plant balancing
- REST API with scoped API keys & rate limiting
- KPI dashboard, OTD, utilization, adherence, CSV/PDF export, KPI snapshots
4. Permissions
Assign under Setup → Staff → Roles. Main capability groups:
| Feature | Typical actions |
|---|---|
| Dashboard | view |
| Work Centers / Shifts / Calendars / Rules | view, create, edit, delete |
| Forecasts / MPS / MRP / Planned Orders | view, create, edit, delete, run |
| Gantt / Auto-Schedule / Capacity | view, edit, run |
| Scenarios / Bottleneck | view, create, run, delete |
| Integration / API Keys | view, create, edit, delete |
| Analytics / Reports / Settings | view, edit |
5. Important Settings
- Default scheduling mode (finite / infinite)
- Planning horizon (days)
- Default priority method (due date, priority, FIFO, etc.)
- Require Manufacturing module
- Auto-reschedule / sync schedule to Manufacturing
- Material reservation & shortage blocking
- REST API enable + rate limit
- KPI targets (OTD, utilization, adherence)
Cron
Use Perfex CRM’s main cron if you enable scheduled sync/jobs:
* * * * * php /path/to/perfex/index.php cron/index > /dev/null 2>&1
6. Uninstall
- Deactivate — hides the module; keeps all data.
- Uninstall — drops all
{prefix}aps_*tables, removesadvanced_aps_*/aps_*options, and deletesuploads/advanced_aps/if present.
Back up the database before uninstalling. Uninstall is destructive and cannot be undone.
After activation — configuration checklist
- Go to Setup → Modules and activate Advanced APS.
- Tables and default options are created automatically on activation.
- Assign staff permissions under Setup → Staff → Roles.
- Open Advanced APS → Settings and configure planning defaults.
- Perfex CRM 2.3.x or later (3.x supported)
- PHP 7.4+ (8.1+ recommended)
- MySQL 5.7+ / MariaDB 10.3+ (InnoDB)
- PHP extensions: mysqli, json, mbstring, curl, fileinfo
- Manufacturing module recommended (work orders / workstations)
- Multi-Plant Management optional (plant-scoped planning)
One-time setup (first time only)
- Setup → Modules → activate Advanced APS.
- Setup → Staff → Roles → assign Advanced APS permissions (view, create, edit, delete, approve, export, settings as needed).
- Open Advanced APS → Settings and complete company defaults, prefixes, integrations, and notification options.
- Create master data (warehouses, products, templates, accounts, routes, etc.) before processing live transactions.
- Enable Perfex CRM cron (
php /path/to/perfex/index.php cron/index) for sync, retries, alerts, and scheduled jobs. - Optionally enable REST API / webhooks in module settings if you integrate external systems.
Tips for success
- Always configure Settings before creating live transactions.
- Create master data (items, warehouses, templates, channels, accounts) first — most modules block incomplete records.
- Use a test/sample record before going live with real customers or production stock.
- Separate roles: operators create/edit; managers approve; finance/reporting get view/export only.
- After any module upgrade, reopen Settings and confirm new options have sensible defaults.
- If overnight jobs fail, verify Perfex CRM cron and check the module log / failed queue screen.
Common questions (FAQ)
Where do I find the module after activation?
In the admin sidebar look for Advanced APS. If missing, your role may lack view permission — fix under Setup → Staff → Roles.
Do I need to edit core Perfex CRM files?
No. Keep all custom code under modules/advanced_aps/. Activate/deactivate from Setup → Modules.
What happens if I uninstall?
Deactivate keeps data. Uninstall usually removes module tables/options (see the Install article). Core customers, invoices, and items are not deleted by well-built modules.
Why can't my staff see a screen?
Almost always a permissions issue. Give the role at least view on that feature, then ask the user to log out and back in.
Reports/export buttons do nothing
Confirm the role has export (or view reports) permission, and that filters return at least one row. Try PDF/CSV from a wider date range.
FAQ from module documentation
Support
For issues or Phase 2+ requests, contact Nasbix Technologies.